The eight wind turbines at Knabs Ridge Wind Farm are now in place. Four of them are operational and the other four are being commissioned which involves ensuring that the turbines have been installed correctly and are safe to begin generating electricity. We anticipate the wind farm becoming fully operational by the end of the summer 2008.