Taff Ely Wind Farm consists of 20 wind turbines each with a maximum output of 450 (kW)
manufactured by Nordtank A/S of Denmark and has been operating since October 1993.
The wind farm has a combined maximum output of 9 megawatts (MW).
It is located 10 kilometres (km) north east of Bridgend, south Wales and is
owned and operated by npower renewables.
